Subscribe!
close-icon

SUBSCRIBE TO OUR MAILING LIST

This field is for validation purposes and should be left unchanged.

News

Brisbane Airport Chiller Upgrade

May 22, 2025

Another successful project delivered by the CV HVAC team!

At a building in the Brisbane Airport precinct, we replaced an old chiller system with a new Daikin 530kW scroll chiller and upgraded two chilled water pump sets – all within a single weekend.

The project required a 150-tonne crane to manage the heavy rooftop lift – no small feat! By Sunday afternoon, the team had the new system installed, commissioned and running, ready for the building’s return to full operations on Monday.

Another challenging task, successfully delivered on a tight timeline thanks to the outstanding planning, coordination and teamwork of the CV HVAC and Daikin Applied Services teams!